Gaotie Kaki高铁搭子

Index of trains, corridors and modelsSnapshot of 9 Nov 2026, dataset v16

Independent and not affiliated with China Railway or 12306.

CR200JS-G

Series
CR200J CR200J(2.0)系列
Brand
Fuxing 复兴号

The set

Design speed
160 km/h
Runs at up to
160 km/h
Cars
12
Seats and berths
755
First in service
Jun 2021
Sets built
3
Built by
  • 中车南京浦镇车辆有限公司
Units in the rail.re roster
3
Sightings
109 of 174,633 sightings, by 3 units on 8 trains

Seats by class

Business Class Seat 商务座
6
First Class Seat 一等座
119
Second Class Seat 二等座
630

From the first formation the source prints.

Formations

Formation 1 编组和席位

755 seats and berths

  • Business 商务座
  • First 一等座
  • Second 二等座
  • Dining 餐车
  • Power car 动力车
Formation as a table. Formation 1 编组和席位 of CR200JS-G, car by car
CarCodeClassSeats
Power carFXN3J_APower Car 动力车
Power carFXN3J_BPower Car 动力车
01ZESecond Class Seat 二等座93
02ZESecond Class Seat 二等座93
03ZESecond Class Seat 二等座93
04ZECSecond Class Seat 二等座Dining area 餐车Second Class Seat 72
05ZESecond Class Seat 二等座93
06ZESecond Class Seat 二等座93
07ZESecond Class Seat 二等座93
08ZYFirst Class Seat 一等座71
09ZYSFirst Class Seat 一等座Business Class Seat 商务座First Class Seat 48Business Class Seat 6
Power carHXD1DJPower Car 动力车
All carsBusiness 6, First 119, Second 630755

Where you meet it

Sightings from 27 Aug to 18 Oct 2026, snapshot of 27 Oct 2026. Some of these sightings are more than 60 days old, so they may predate the current timetable.

Lhasa to Shigatse 拉萨到日喀则3 trains

  1. C884Shigatse 日喀则Rikaze Railway Station to Lhasa 拉萨Lasa Railway StationStrong, 46 of 46 sightings
  2. C888Shigatse 日喀则Rikaze Railway Station to Lhasa 拉萨Lasa Railway StationStrong, 43 of 43 sightings
  3. C885Lhasa 拉萨Lasa Railway Station to Shigatse 日喀则Rikaze Railway StationLikely, 4 of 4 sightings

Lhasa to Nyingchi 拉萨到林芝1 train

  1. C4390Nyingchi 林芝Linzhi Railway Station to Lhasa 拉萨Lasa Railway StationLikely, 5 of 5 sightings

Route unknown 路线未知1 train

  1. C4394Route unknownLikely, 7 of 7 sightings

Not listed here, 3 trains with a Hint tier.

Known problems

The source lists no problems for this model.

Comfort notes from the source

  • 整车气密性强化,车体结构方面,车外采用满焊、车内采用满焊或段焊加密封胶,冷凝水集中收集和排放,给水卫生系统系统取消地漏,灰水管设置压力保护器,制动及电气管路通过孔采用专用密封胶密封。
  • 空调通风系统方面,头车设置压力波控制器安装接口,拖车及控制车空调机组增加气动压力波保护装置接口、预留带气动压力波保护装置的废排装置安装接口,风挡改为对波橄榄型双层折棚风挡,提高车体气密性。
  • 座位数及布局与CR200J第一代保持不变,但坐席宽度有所增加且乘客使用的充电插座由坐席下部改为与CR300/400系列相同的位置,即二等座插座位于座椅接缝处下方,一等座位于中央扶手。

English translation pending review. Source page on china-emu.cn

Trains that most often get this model

  1. C884, Shigatse 日喀则 to Lhasa 拉萨, 46 of 46 sightings
  2. C888, Shigatse 日喀则 to Lhasa 拉萨, 43 of 43 sightings
  3. C4394, route unknown, 7 of 7 sightings
  4. C4390, Nyingchi 林芝 to Lhasa 拉萨, 5 of 5 sightings
  5. C885, Lhasa 拉萨 to Shigatse 日喀则, 4 of 4 sightings
  6. C881, Lhasa 拉萨 to Nyingchi 林芝, 2 of 2 sightings
  7. C887, Lhasa 拉萨 to Shigatse 日喀则, 1 of 1 sighting
  8. C4393, route unknown, 1 of 1 sighting

Sightings from rail.re, pulled 27 Oct 2026.