Gaotie Kaki高铁搭子

Index of trains, corridors and modelsSnapshot of 9 Nov 2026, dataset v16

Independent and not affiliated with China Railway or 12306.

Train D7595

Stops
5
Operator
CR Guangzhou国铁广州局集团有限公司
Data shown
Usual set from our snapshot of 27 Oct 2026. Times come live from 12306 when it answers, with the time we checked.
On the 12306 list
Monday 9 Nov 2026 to Monday 23 Nov 2026. All 15 days we checked. Our copy covers 9 to 23 Nov 2026.

Usual set

The set rail.re saw on this train most often.

CRH1A Hexie 和谐号

The tracker reports it as CRH1A, which covers CRH1A-200 and CRH1A-250.

LikelyProbably CRH1A. 8 of 9 sightings since 6 Oct.

Seen
Seen 6 Oct to 16 Oct 2026, on 9 days.
Other sets seen on D7595
Cars
8
Brand
Hexie 和谐号

Known problems

From the model catalogue's own problems section.

  • HighEar pressure in tunnelsOn lines with long, closely spaced tunnels, passengers can feel strong ear pressure when the train runs through tunnels at speed. The air conditioning does not switch to recirculation by itself, and on these lines the driver cannot switch it by hand in time.

Formation

Car by car, when the source prints a layout.

The tracker reports this set only as CRH1A, and the car layout differs between CRH1A-200 and CRH1A-250. Each layout is on its model page.

Stops

Every stop in order. Live from 12306 when it answers.

Stop times from our snapshot of 9 Nov 2026.

Stops of D7595 in order, origin first
StopArrivesDepartsWait
Guangzhou 广州Guangzhou Railway StationStarts here 14:53
Guangzhou East 广州东Guangzhoudong Railway Station15:02 15:053 min
Dongguan South 东莞南Dongguannan Railway Station15:48 15:502 min
Shenzhen North 深圳北Shenzhenbei Railway Station16:12 16:164 min
Futian 福田Futian Railway Station16:24 Ends here

Times and tickets

On 12306, the official site.

12306 has seats left and the booking.

How we know

rail.re logs which unit ran which train, one or two sightings a unit a day. We count those sightings for D7595, pulled 27 Oct 2026. Sets change at every timetable change.

Sightings of D7595, seen 6 Oct to 16 Oct 2026, on 9 days
SetShareSightings
CRH1A8
CRH1A-2001
All sightingson 9 days9

Read the method